The Miami International Airport Central Base Apron and Utilities Modification and Expansion project includes restoration of the North Terminal Development (NTD) Gate Area, reconstruction and expansion of the north apron over the existing drainage canal, reconfiguration of the area south of the NTD for additional aircraft parking, realignment of the vehicle service road and reconstruction of the existing central base apron pavement, drainage, and lighting. More specifically, VERTEX provided the temporary drainage plans and report for the multi-phased project to ensure compliance during the removal of the existing storm and the installation of the new storm sewer utilities. A phased construction approach in addition to a multitude of other existing onsite utilities required a well-coordinated effort between the airport, the contractor and the engineer to allow for timely and proper installation of the utilities for the Project.
To learn more about VERTEX’s Engineering Design services or to speak with an Engineering Expert, call 888.298.5162 or submit or inquiry.